Rescue project for Avena Kantvik Oy

In 2021, CTI successfully carried out a challenging rescue project for Avena Kantvik Oy after the original contract with the boiler supplier was terminated.

The assignment was to complete the implementation of a 5+5 MW bio-steam plant in the role of main contractor. We took over the project at the halfway point of execution.

The steam plant was first completed mechanically. We ten carried out cold and hot testing, including system tuning. Finally, we performed the full commissioning and handed over the plant to the customer in a condition that met the original contractual obligations.

This project once again demonstrates our capabilities in demanding environments – both as a system integrator and a main contractor. We are proud of this achievement and ready to support future clients facing similar challenges.